Newsletter
Mining News, Exploration & Discoveries in Gold, Silver, Copper, PGEs and Critical Minerals
Advertisement
  • Home
  • Mining
  • Commodities
  • Profiles
  • AlertsHot
No Result
View All Result
  • Home
  • Mining
  • Commodities
  • Profiles
  • AlertsHot
No Result
View All Result
Mining News, Exploration & Discoveries in Gold, Silver, Copper, PGEs and Critical Minerals
No Result
View All Result
Home Mining

BCM Completed Core Cutting and Sampling of Strongly Mineralized TK20 Porphyry/Skarn Mineralized Drill Core.

Paul Leblanc by Paul Leblanc
September 3, 2026
in Mining
0
87
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Vancouver, British Columbia–(Newsfile Corp. – September 3, 2026) – BCM Resources Corporation (TSXV: B) (“BCM” or the “Company”) is pleased to announce that core logging, sawing, and sample collection of core from diamond drill hole TK20 at its 100% owned Thompson Knolls (TK) project has now been completed. The third and final batch of samples has been sent to the ALS preparation lab in Elko, Nevada. Due to intense potassic alteration and silicification of the rock encountered in this hole, the core was exceptionally hard and required considerable patience and multiple diamond saw blades to split.

Intense porphyry-style quartz-molybdenum and skarn magnetite-chalcopyrite mineralization from TK20 comes from one of the porphyry centers intersected in the Phase 4 drilling campaign at TK (see Figures 1 and 2 below). Currently, the Company is advancing its TK21 drill hole, located west of TK20 (see the Company news release dated August 17, 2026).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6598/312716_69a4c679540e2a02_002full.jpg

Figure 1. TK20 Box 315 of HQ core from 2,782 to 2,791 ft. Brown potassically altered and silicified QMP with disseminated magnetite and 7/8″-thick Mo-rich bluish quartz veinlets. An estimated 10% volume is sulfides, mainly molybdenite.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6598/312716_69a4c679540e2a02_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6598/312716_69a4c679540e2a02_003full.jpg

Figure 2. TK20 Box 416 from 3,644 to 3,652 ft. Magnetite-sulfide hydrothermal breccia in green skarn containing an estimated 20 % volume of sulfides, mainly chalcopyrite. 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6598/312716_69a4c679540e2a02_003full.jpg

Dr. Sergei Diakov, President and CEO of BCM Resources, commented: “We are happy with the successful completion of intense sample preparation work of TK20 drill core. We are looking forward to the final assay results for the TK20 drill hole samples from the ALS International lab.”

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6598/312716_69a4c679540e2a02_004.jpg

Figure 3. TK core cutting process.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6598/312716_69a4c679540e2a02_004full.jpg

Fieldwork at TK continues. In parallel with drilling of hole TK21, BCM just completed its geophysical survey at Thompson Knolls. IP/MT data were collected by Zonge International Geophysical Services & Instruments. Data were collected from four lines covering all three previously outlined geophysical anomalies 1, 2, and 3 (see BCM presentation on the Company website) and are currently being processed.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6598/312716_69a4c679540e2a02_005.jpg

Figure 4. Geophysicist field truck at TK.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6598/312716_69a4c679540e2a02_005full.jpg

Qualified Person and QAQC

Mr. Richard R. Redfern, M.Sc., a Certified Professional Geologist and a Company “qualified person” for the purposes of National Instrument 43-101, has verified and approved the information contained in this news release.

About BCM Resources Corporation

BCM Resources is a diversified Canadian mineral exploration company primarily focused on advancing exploration of its 100% controlled Thompson Knolls Porphyry Cu, Au, Ag, Mo discovery. The Company also controls prospective Copper, Gold, and Molybdenum exploration projects in British Columbia. The Company is managed by experienced and successful board members and advisors. For further information, including area maps, sections, and photos, please visit our website at www.bcmresources.com or contact us by e-mail at info@bcmresources.com.

ON BEHALF OF BCM RESOURCES CORP.

“Sergei Diakov”
President and Chief Executive Officer

For further information, please contact:

Investor Relations, Telephone: +1 (604) 646-0144, ext. 221
info@bcmresources.com
www.bcmresources.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Concerning Forward-Looking Statements:

This news release and related texts and images on BCM’s website contain certain “forward-looking statements” including, but not limited to, statements relating to the interpretation of mineralization potential, drilling and assay results, future exploration work, and the anticipated results of this work. Forward-looking statements are statements that are not historical facts and are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metals prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical, governmental, social, or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company’s projects; uncertainties involved in the interpretation of sampling and drilling results and other tests; the possibility that required permits and access agreements may not be obtained in a timely manner; risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions, and; the possibility of cost overruns or unanticipated expenses in these exploration programs.

Source: https://www.newsfilecorp.com/release/312716/BCM-Completed-Core-Cutting-and-Sampling-of-Strongly-Mineralized-TK20-PorphyrySkarn-Mineralized-Drill-Core.

Share35Tweet22
Previous Post

Benton and Metals Creek Acquire an Additional 262 Claim Units at Smoking Gun Hydrogen-Helium in Newfoundland, Awaiting Final Results from the Gas Sampling Program

Next Post

Kenorland Minerals Reports Assay Results from Maiden Diamond Drill Program at the Western Wabigoon Project, Ontario

Related Posts

Thistle Resources Commences Its 3000m Drill Program at Its Middle River Gold Project in the Bathurst Mining Camp, NB

by Paul Leblanc
September 3, 2026
0

Toronto, Ontario--(Newsfile Corp. - September 3, 2026) - THISTLE RESOURCES INC. (TSXV: TRCG) (OTCQB: TRCGF) (FSE: BU9) (the "Company" or...

Miravalles Gold Corp. Files NI 43-101 Technical Report for Fairfield Gold Project, Nayarit, Mexico

by Paul Leblanc
September 3, 2026
0

<img src="https://api.newsfilecorp.com/newsinfo/312698/156" id="156" width="2" height="2" style="width: 1px; height: 1px;border: 0px solid;" />Vancouver, British Columbia--(Newsfile Corp. - September 3, 2026) -...

Crossroads Gold Continues to Define Multiple High-Grade Gold-In-Soil Assays at Pambula, including 21.8 g/t Gold, and Announces DTC Eligibility of its Common Shares in the U.S.

by Paul Leblanc
September 3, 2026
0

<img src="https://api.newsfilecorp.com/newsinfo/312705/156" id="156" width="2" height="2" style="width: 1px; height: 1px;border: 0px solid;" />HighlightsMultiple high-grade gold-in-soil assays of up to 21.8 g/t...

Homeland Allows Non-Core Portions of the Coyote Basin Project to Lapse

by Paul Leblanc
September 3, 2026
0

<img src="https://api.newsfilecorp.com/newsinfo/312709/156" id="156" width="2" height="2" style="width: 1px; height: 1px;border: 0px solid;" />Vancouver, British Columbia--(Newsfile Corp. - September 3, 2026) -...

Magna Terra Announces Upsize of Private Placement to $3.75 Million

by Paul Leblanc
September 3, 2026
0

<img src="https://api.newsfilecorp.com/newsinfo/312733/156" id="156" width="2" height="2" style="width: 1px; height: 1px;border: 0px solid;" />Toronto, Ontario--(Newsfile Corp. - September 3, 2026) - Magna...

Load More
  • Trending
  • Comments
  • Latest
Former Canadian Minister Seamus O’Regan Joins Power Metallic as Company Pushes Global Expansion

Former Canadian Minister Seamus O’Regan Joins Power Metallic as Company Pushes Global Expansion

August 28, 2025
Glencore’s Copper Output Slides 40% Since 2018 Despite Q3 Rebound

Glencore’s Copper Output Slides 40% Since 2018 Despite Q3 Rebound

October 30, 2025
Copper Extends Gains on Signs of U.S. Growth and Chinese Stabilization

Copper Extends Gains on Signs of U.S. Growth and Chinese Stabilization

August 31, 2025
AI Demand Seen Driving Copper’s Long-Term Outlook

AI Demand Seen Driving Copper’s Long-Term Outlook

September 16, 2025
Former Canadian Minister Seamus O’Regan Joins Power Metallic as Company Pushes Global Expansion

Former Canadian Minister Seamus O’Regan Joins Power Metallic as Company Pushes Global Expansion

0
Copper Extends Gains on Signs of U.S. Growth and Chinese Stabilization

Copper Extends Gains on Signs of U.S. Growth and Chinese Stabilization

0
Gold Breaks Above Summer Range, Eyes Year-End Rally

Gold Breaks Above Summer Range, Eyes Year-End Rally

0
McEwen Mining: Grey Fox Delivers Strong Gold Intercepts

McEwen Mining: Grey Fox Delivers Strong Gold Intercepts

0

Thistle Resources Commences Its 3000m Drill Program at Its Middle River Gold Project in the Bathurst Mining Camp, NB

September 3, 2026

Miravalles Gold Corp. Files NI 43-101 Technical Report for Fairfield Gold Project, Nayarit, Mexico

September 3, 2026

Crossroads Gold Continues to Define Multiple High-Grade Gold-In-Soil Assays at Pambula, including 21.8 g/t Gold, and Announces DTC Eligibility of its Common Shares in the U.S.

September 3, 2026

Homeland Allows Non-Core Portions of the Coyote Basin Project to Lapse

September 3, 2026
ADVERTISEMENT
Mining News, Exploration & Discoveries in Gold, Silver, Copper, PGEs and Critical Minerals

© 2025 MinersWire.com.  DISCLAIMER - PRIVACY POLICY -  TOS -  CONTACT - SUBMIT A CORRECTION , All Right Reserved

No Result
View All Result
  • Home
  • Mining
  • Commodities
  • Profiles
  • Alerts

© 2025 MinersWire.com MinersWire.