Newsletter
Mining News, Exploration & Discoveries in Gold, Silver, Copper, PGEs and Critical Minerals
Advertisement
  • Home
  • Mining
  • Commodities
  • Profiles
  • AlertsHot
No Result
View All Result
  • Home
  • Mining
  • Commodities
  • Profiles
  • AlertsHot
No Result
View All Result
Mining News, Exploration & Discoveries in Gold, Silver, Copper, PGEs and Critical Minerals
No Result
View All Result
Home Mining

Copper Fox Announces 2026 Schaft Creek Program

Paul Leblanc by Paul Leblanc
April 6, 2026
in Mining
0
87
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Calgary, Alberta–(Newsfile Corp. – April 6, 2026) – Copper Fox Metals Inc. (TSXV: CUU) (OTCQX: CPFXF) (FSE: HPU) (“Copper Fox” or the “Company”) is pleased to provide an overview of the planned 2026 program at Schaft Creek, focused on addressing key aspects required in transitioning the project to the Pre-Feasibility Stage. The Schaft Creek project is managed through the Schaft Creek Joint Venture (“SCJV”). Teck Resources Limited (“Teck”) is the Operator of the SCJV and holds a 75% interest with Copper Fox holding the remaining 25% interest. The Schaft Creek deposit, located in northwestern British Columbia, is one of the largest undeveloped porphyry copper deposits in North America that contains significant gold-molybdenum-silver by-products. Highlights of the 2026 program are:

Highlights

  • Planned expenditures in 2026 of C$9.1 million.
  • Addresses key aspects of the Scoping Study review including a technical review of the geological model, metallurgical testwork, tailings and mine plan options analysis and access road trade-off studies.
  • Preparation for the Pre-Feasibility Study.
  • Limited camp maintenance and environmental sampling field program.
  • BC Hydro System Impact Study.

Elmer B. Stewart, President and CEO of Copper Fox, stated, “Copper Fox is pleased with the scope and direction of the 2026 budget and program. The emphasis on the project is transitioning from data collection to assessing the technical status of the project and is forward-looking in terms of energy requirements. The close out of the Scoping Stage review is a critical aspect of project development in preparation for entering the Pre-Feasibility Stage.”

Technical Reviews
Since completion of the 2021 Preliminary Economic Assessment, the SCJV has conducted a series of investigations designed to advance key project parameters of the project. The reviews planned in 2026 are focused on assessing the status of each of these key project parameters and identifying possible data gaps to determine if additional studies are required to meet the threshold for a Pre-Feasibility Study for the Schaft Creek project in accordance with industry standards.

System Impact Study
A major component of project planning is to determine its energy requirements and to ensure access to the energy required to meet operating requirements. The SCJV has retained BC Hydro to complete a System Impact Study to better understand the energy requirements of the Schaft Creek project and its impact on the British Columbia electrical grid. The study is expected to take several years to complete.

Field Program
The 2026 field program is focused on completing maintenance and upgrades to the camp for future programs and conducting limited environmental data collection.

Qualified Person
Elmer B. Stewart, MSc. P. Geol., President and CEO of Copper Fox, is the Company’s non-independent, nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information disclosed in this news release.

About Copper Fox
Copper Fox is a Canadian resource company focused on copper development and exploration in the United States and Canada. Copper Fox and its subsidiaries own 100% of the Van Dyke ISCR project, a development stage, potential near term, mid-size copper mine in Arizona and a 25% interest in the Schaft Creek Joint Venture with Teck Resources Limited (75% interest and Operator) which hosts the Schaft Creek copper-gold-molybdenum-silver project in British Columbia’s Golden Triangle. In addition, Copper Fox owns 100% of the resource stage Eaglehead polymetallic porphyry copper project in northwestern British Columbia and the Sombrero Butte and Mineral Mountain advanced exploration stage porphyry copper projects located in the prolific Laramide age copper province in Arizona. For more information on Copper Fox’s mineral properties and investments visit the Company’s website at www.copperfoxmetals.com.

For additional information contact: Lynn Ball at 1-844-464-2820 or investor@copperfoxmetals.com.

On behalf of the Board of Directors

Elmer B. Stewart
President and Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information
This news release contains “forward-looking information” within the meaning of the Canadian securities laws. Forward-looking information is generally identifiable by use of the words “believes,” “may,” “plans,” “will,” “anticipates,” “intends,” “budgets”, “could”, “estimates”, “expects”, “forecasts”, “projects” and similar expressions, and the negative of such expressions. Forward-looking information in this news release includes statements regarding the 2026 budget and program; reviewing key project parameters; preparation for a Pre-Feasibility Study; camp upgrades and Baseline Environmental Program; and a Systems Impact Study.

In connection with the forward-looking information contained in this news release, Copper Fox and its subsidiaries have made numerous assumptions, regarding, among other things: the geological, metallurgical, engineering, financial and economic advice that Copper Fox has received is reliable and is based upon practices and methodologies which are consistent with industry standards. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies.

Additionally, there are known and unknown risk factors which could cause Copper Fox’s actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: the 2026 budget and program may not be completed as planned or at all; the key project parameters may not be reviewed as planned or at all; preparation for a Pre-Feasibility Study may not be completed as planned or at all; camp upgrades and Baseline Environmental Program may not be completed as planned or at all; the Systems Impact Study may not be completed as planned or at all; the need to obtain additional financing; uncertainty as to the availability and terms of future financing.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox’s continuous disclosure filings with Canadian securities regulatory authorities at www.sedarplus.ca. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events, or developments, except as required by law.

Source: https://www.newsfilecorp.com/release/291028/Copper-Fox-Announces-2026-Schaft-Creek-Program

Share35Tweet22
Previous Post

Newpath Resources Announces Termination of Northshore Option Agreement

Next Post

Antimony Resources Corp. (ATMY) (ATMYF) (K8J0) Initiates Technical and Environmental Studies Towards Permitting the Bald Hill Antimony Project

Related Posts

Enertopia Announces Filing of Patent-Pending Oxyhydrogen System

by Paul Leblanc
April 6, 2026
0

Kelowna, British Columbia--(Newsfile Corp. - April 6, 2026) - Enertopia Corp. (OTCQB: ENRT) (CSE: ENRT) ("Enertopia'' or the "Company") announces...

H.C. Wainwright Initiates Coverage of Atlas Critical Minerals

by Paul Leblanc
April 6, 2026
0

Belo Horizonte, Brazil--(Newsfile Corp. - April 6, 2026) - Atlas Critical Minerals Corporation (NASDAQ: ATCX) ("Atlas Critical Minerals" or "Company"),...

Benton Increases Interest in Great Burnt Project and Identifies High Priority Target

by Paul Leblanc
April 6, 2026
0

Thunder Bay, Ontario--(Newsfile Corp. - April 6, 2026) - Benton Resources Inc. (TSXV: BEX) ("Benton" or the "Company") is pleased...

Advanced Gold Exploration Announces Uplisting to OTCQB

by Paul Leblanc
April 6, 2026
0

Toronto, Ontario--(Newsfile Corp. - April 6, 2026) - Advanced Gold Exploration Inc. (CSE: AUEX) (FSE: ZF2) (OTCQB: AUHIF) ("Advanced Gold"...

Riley Gold Receives Proceeds of $1.67M from Warrant Exercises

by Paul Leblanc
April 6, 2026
0

Vancouver, British Columbia--(Newsfile Corp. - April 6, 2026) - Riley Gold Corp. (TSXV: RLYG) (OTCQB: RLYGF) ("Riley Gold" or the...

Load More

$CUU Charts

  • Trending
  • Comments
  • Latest

Collective Metals Ends Princeton Project Agreement to Pursue New Opportunities

July 8, 2025
Former Canadian Minister Seamus O’Regan Joins Power Metallic as Company Pushes Global Expansion

Former Canadian Minister Seamus O’Regan Joins Power Metallic as Company Pushes Global Expansion

August 28, 2025
Copper Extends Gains on Signs of U.S. Growth and Chinese Stabilization

Copper Extends Gains on Signs of U.S. Growth and Chinese Stabilization

August 31, 2025

American Battery Technology Fast-Tracks Tonopah Flats Lithium Project

July 4, 2025

Giga Metals Plans Debt Settlement to Strengthen Financial Position

0

Kibali Gold Mine Expands as Gold Market Hits New Heights

0

Yukon Metals Discovers New Copper Zone and Expands Drilling Efforts

0

Foremost Clean Energy Starts Drilling at Murphy Lake South Project

0

Enertopia Announces Filing of Patent-Pending Oxyhydrogen System

April 6, 2026

H.C. Wainwright Initiates Coverage of Atlas Critical Minerals

April 6, 2026

Benton Increases Interest in Great Burnt Project and Identifies High Priority Target

April 6, 2026

Advanced Gold Exploration Announces Uplisting to OTCQB

April 6, 2026
ADVERTISEMENT
Mining News, Exploration & Discoveries in Gold, Silver, Copper, PGEs and Critical Minerals

© 2025 MinersWire.com.  DISCLAIMER - PRIVACY POLICY -  TOS -  CONTACT - SUBMIT A CORRECTION , All Right Reserved

No Result
View All Result
  • Home
  • Mining
  • Commodities
  • Profiles
  • Alerts

© 2025 MinersWire.com MinersWire.